0
Skip to Content
Laing's Painting & Carpentry Inc.
Laing's Painting & Carpentry Inc.
Projects
Gallery
Book An Estimate
Laing's Painting & Carpentry Inc.
Laing's Painting & Carpentry Inc.
Projects
Gallery
Book An Estimate
Folder: Projects
Back
Gallery
Book An Estimate
Finished Painting of 
a exterior home we painted
Replacing shutters
IMG_20220106_145657.jpg
IMG_20220107_170708.jpg
IMG_20220105_120158.jpg
image_6487327 (3).JPG
image_6487327 (2).JPG
IMG_20211229_150042 (1).jpg
image_6487327 (1).JPG
image_6487327.JPG
IMG_20211228_083517.jpg
image000001.jpg
house2.jpg
IMG-8212.jpg
image000003.JPG
image000004 (1).JPG
image000000.jpg
deck.jpg
deck3.jpg
20211021_135356.jpg
20211021_135420.jpg
20211021_135335.jpg
Screenshot_20210511-212502_Messages.jpg
Screenshot_20210511-212304_Messages.jpg
20210125_142759.jpg
20210125_142807.jpg
20210405_170713.jpg
20210405_175032.jpg
IMG20220714165147 (2).jpg
Screenshot_2022-08-13-09-54-56-79_cf3cf72bd8e53b0db7ddb0a6f2208af9 (1).jpg
IMG20220810152749 (1).jpg
IMG20220714165021 (2).jpg
IMG20220811083351.jpg
IMG20220810172730.jpg
IMG_20220428_104300.jpg
IMG_20220429_113616.jpg
IMG_20220511_181315_2 (2).jpg
IMG_20220511_090316_007.jpg
IMG_20220613_143252.jpg
IMG_20220707_205040 (1).jpg
Before Exterior Painting Of Home
Finished Painting Of Exterior Home
Before interior painting of foyer & Exterior Door
Before Painting Of Stairwell/ Hallway and ceiling
Finish Interior Painting & Painting of the Exterior Door
Finished Painting of hallway/stairwell of walls and ceilings
Before Installation Of baseboard, Trim, & Painting of the  bathroom
Finished Interior Painting of the bathroom / Installation Of baseboard and trim around the window
Before We removed the plastic paneling
Green Minimalist Maintenance Housing Logo (1).png
Before Exterior White Wash
Finished Interior Painting/ White Wash Of Chimney
Before railings and spindles / Floor installation
We installed the railings and spindle kit
Before we painted this exterior brighton  home/ Carpenter repairs
Finished exterior paint job. We painted all the trim and all the body of the exterior
Power Washing the exterior before painting the Brighton home
image_6487327 (59).JPG
Finished exterior brighton home, We painted
Finished Exterior Brighton home  & demoing, and repairing the wooden soffit that was rotted out and replaced
Before Exterior paint job. We demoed, repaired the rotted soffit with new board
IMG-20230531-132500381-HDR.jpg
Before we painted garage
Repaired the rotted trim around the window
Demoed trim around the window before trim installation
IMG-20230513-184834493-HDR.jpg
Sealing the clients driveway
Finished window trim and painted
Finished garage
Finished deck we have painted
Finished deck we have painted
Finished painted deck
Back finished exterior of the house
Before we painted the garage
Before we remodeled the bathroom
Demoing the tile off the bathroom wall
Removing the toilet and doing some plumbing work/ installing a new toilet
image_6487327 (41) (1).JPG
plumbing work
Finished bathroom remodel. We removed the old sink on replacement of a new sink, We tore out and installed new flooring, Removed and installed a new toilet
image_6487327 (43) (1).JPG
image_6487327 (44) (1) (2).JPG
Finished bathroom remodel
Partnership with sherwin williams
Fully painted/Home remodeling/new shutters installed and 3 new pillars installed
Finished Exterior, back of the house.  8 new Anderson 200 windows installed,  3 exterior doors, And new trim around all the windows.
New decorative trim piece installed, And new upper trim, we installed as well which is white
Finished painted back side of the clients home
Installed 3 new pillars
Exterior painting finishing
20231004_114916.jpg
New siding installed before exterior painting
Section of the rotted siding that we replaced
Demo trim around the window before trim and window installation
More siding replaced due to rotted siding we removed
More siding replaced due to the rotted siding we removed
20230921_144204.jpg
More siding installed plus we installed an exterior door which is in the picture
Exterior before the the painting / Remodeling
All rotted siding that we removed before we installed the new siding and paint job
We removed the rotted siding before replacing and we demoed the trim around the garage window that we replaced, What you see is the existing window
Before exterior painting/remodeling 
of the back of the exterior home
20230827_160341.jpg
Yellow and Black Handyman Flyer .png
Before we raised the loose handrail and patched the old holes
After we raised, secured, and patched the old holes after the handrail was raised
demo handrail before raising and finding the new studs
Framing and prepping  for the wine rack
The wine rack wa built into the wall,with ceramic tile, ans and a glass sliding door
Finshed wine rack that holds 48 bottles of wine
After scraping the loose paint, And skim coating the ceiling first, We are coming in to repair after the water leak problem was fixed
Mon,Dec 11} Finished ceiling, skim coated, sanded, and painted
Prepping and cutting in/ Before painting the living room
cutting and prepping before photo
Finished product/ Walls are painted
Before painting the living room/stairwell /prepping
Finished product, living room was painted, and stairwell got painted as well
Finished Painted Exterior
Finished Painted Exterior Home
Finished kitchen remodel, We installed the new cabinets, Back-splash, Counter-top, and the island in the center of the kitchen
New Commercial Exterior Building door installed....The snow prevented us from being able to apply exterior trim paint
Finished back of an exterior home we painted
Finished exterior barn with a new color and fully prepped
20240502_152139 (3).jpg
20240502_152151 (1).jpg
Laminate Vinyl plank flooring installed, Quarter round installed, Baseboard installed, And a full interior painting job was done
Laminate Vinyl Plank flooring  installed, Bedroom received interior finished paint,Trim was painted,Quarter round was installed, Baseboard was installed, Floor vent was installed as well.
Interior painting,Vinyl plank flooring was installed, metal stair trim was installed,
Stairwell received a full interior paint job, Metal stair trim was installed, Quarter round was installed, And Laminate Vinly Flooring was installed
IMG_5647.jpg
Full exterior painting, Applied two finished coats of exterior trim pain, Applied two finished coats of exterior body paint on the house
The back of the house received 2 coats of finished exterior paint on the body of the house, We Applied two coats of finished paint around the trim of the house
Exterior front of the house, We  applied two finished coats of exterior  body paint on the house, We applied two finished coats of trim paint on the house, We reglaze the windows

Laings Painting And Carpentry Inc.

104 East Ave, Suite 246, Rochester, NY 14604

21 Goodway Drive, Henrietta, NY 14623

600 Fisher Station, Victor, NY 14564

Office (585) 536-1229 Cell (585) 201-4508 Fax 1 (888) 357-0402

laingspaintingandcarpentry@gmail.com